"MIDWEST" LONG LEAD LAG SHIELDS Zinc. Requires 3/4" bit. Takes 1/2" screw. Use in mortar & concrete. Long. Boxed of 50. 1/4 L Size. WARNING: This product can expose you to chemicals including Lead, which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more infor
“MIDWEST” LONG LEAD LAG SHIELDS
- Zinc.
- Requires 3/4″ bit.
- Takes 1/2″ screw.
- Use in mortar & concrete.
- Long.
- Boxed of 50.
- 1/4 L Size.
WARNING: This product can expose you to chemicals including Lead, which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information, go to www.P65Warnings.ca.gov
Specifications
MFR: 04185 SKU: 11937354 UPC: 738287041859 Brand: Midwest Products Length: 4 Width: 5 Height: 3






Reviews
There are no reviews yet.